In September last year, Green Power won an overseas 100-ton/day electrolytic zinc turnkey project with professional technical services, meticulous business negotiations, and mature solutions. The entire project includes electrolytic zinc rectifier cabinets, transformer systems, and All equipment of the entire electrolysis workshop, including the electrolyzer, cathode and anode plates and other important components. After several months of rigorous material selection, design, assembly, commissioning, and acceptance of all equipment, nearly 400 boxes of equipment were all prepared and finally shipped smoothly yesterday and sent to the destination country.Cheers!


2021年03月13日

Several Shipments Of The IGBT Rectifier Under The Epidemic
none

Previous:

Next:

Nearly 400 Boxes Of Equipment Were All Prepared And Finally Shipped Smoothly

In September last year, Green Power won an overseas 100-ton/day electrolytic zinc turnkey project with professional technical services, meticulous business negotiations, and mature solutions. The entire project includes electrolytic zinc rectifier cabinets, transformer systems, and All equipment of the entire electrolysis workshop, including the electrolyzer, cathode and anode plates and other important components. After several months of rigorous material selection, design, assembly, commissioning, and acceptance of all equipment, nearly 400 boxes of equipment were all prepared and finally shipped smoothly yesterday and sent to the destination country.Cheers!

Add Time: